The Quantum-Nano Centre was named after Waterloo chancellor Mike Lazaridis and his wife Ophelia. The new centre will be home to the Institute for Quantum Computing, the Waterloo Institute for Nanotechnology and an undergraduate program in nanotechnology engineering and will be the first research facility of its kind in the world. The five-story, 900 m² building is expected to be completed by 2009. ComBAR will be installed as plain reinforcement in the approx. 610m² raft foundation on the ground floor. Here the fact that ComBAR bars are non-metallic and therefore non-magnetic was the deciding property in addition to its superior bond properties (limitation of the crack widths) and durability characteristics. |
|
Project Name
|
Element
|
Dimensions
|
Originally designed with
|
To be installed in
|
|
Caso Overhead
|
PL-3 Barriers
|
Length: 4 x 56m
|
Stainless Steel
|
2009
|
|
Provincial Road Overpass
|
PL-3 Barriers
|
Length: 4 x 48m
|
Stainless Steel
|
2009
|
|
9th Concession Road Underpass
|
PL-2 Parapets
|
Length: 2 x 67m
|
1st Generation GFRP
|
2009
|
|
Essex Cty Road 43 Underpass
|
PL-2 Parapets
|
Length: 2 x 67m
|
Stainless Steel
|
2009
|
|
Dwyer Hill Road Bridge
|
PL-3 Barriers
|
Length: 2 x 101m
|
Stainless Steel
|
2010
|
|
Ashton Station Road Bridge
|
PL-3 Barriers
|
Length: 2 x 99m
|
Stainless Steel
|
2010
|
|
QEW Widening in Burlington
|
PL-2 Barrier
|
Length: approx. 600m
|
1st generation GFRP
|
2009
|
|
Quantum-Nano-Centre Waterloo
|
Raft Foundation
|
Area: ca. 610m²
|
ComBAR GFRP
|
2009
|
| Queen's Line Bridge |
PL-2 Parapets |
Length: 2 x 37m |
Epoxy Coated Steel |
2008 |
|
References
|
18.06.2010
|
|
Products: |
ComBAR® |
|
|
Task: |
For this bridge rehabilitation project we have delivered ComBAR® bars as well as bent... |
|
|
18.06.2010
|
|
Products: |
ComBAR® |
|
|
Task: |
We received the contract for this exciting project a couple of weeks ago. The complet... |
|
|
04.08.2009
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
The Schöck Isokorb QST is being used to solve the thermal bridge problem of the build... |
|
|
04.08.2009
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
A research centre of a special kind - the unique "Mike and Ophelia Lazaridis Quantum ... |
|
|
16.06.2009
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
Steel-free, non-corrosive and durable reinforcement in the bridge parapet walls of th... |
|
|
16.06.2009
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
Reinforcement of high quality aesthetic pre-cast concrete wall units for a 3.2 km lon... |
|
|
16.06.2009
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
This project is to be especially highlighted as these are the first approach slabs to... |
|
|
16.06.2009
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
The barrier walls at the Walker Road Overpass were originally designed using stainles... |
|
|
16.06.2009
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
Replacement of the carriageway slab within the range of the electronic vehicle detect... |
|
|
16.06.2009
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
In connection with the modernisation of the shopping centre the existing load distrib... |
|
|
12.06.2009
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for steel-to-steel connection of cantilever elements, transfers tension... |
|
|
12.06.2009
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for concrete-to-steel connection of cantiliver elements, transfers bend... |
|
|
12.06.2009
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for steel-to-steel connection of cantilever elements, transfers tension... |
|
|
12.06.2009
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for concrete-to-steel connection of cantiliver elements, transfers bend... |
|
|
|
YOUR CONTACT
Schoeck Canada Inc. 199 Trillium Drive N2E 1W9 Kitchener, Ontario
Tel: +1 519 896 2100 cell phone: +1 416 890 8393
Fax: +1 519 896 2190 |
christian.witt@ schoeck.com |
|